Permit For SitePlan

Loading

3D Design Services

100% Guaranteed Compliant Plans
Accepted by All Local Authorities
Delivered Within 24 Hours
Unlimited Free Revisions
100% Money-Back Guarantee
58K+Plans Delivered
32,530+Happy Customers
6,160+5-Star Reviews
2,000+Cities Served
15+ YrsIndustry Experience
Professional site plan drafter working on permit drawings
58K+ Plans Delivered
About Us

Trusted by Contractors, Homeowners, and Developers Across the USA

We serve contractors, developers, and homeowners who require accurate, professional, and compliant site plans without any delays. From small residential projects to more detailed layouts, we prepare custom site plans that meet local government standards.

Our experts understand how frustrating permit requirements are. Every city has its own regulations, and a minor error can stop the entire process. We keep things right — creating accurate Floor Plans, Sub-Division Designs, Elevations, and 3D Renderings that fulfil local requirements, helping reduce revisions and keep your project on track.

  • Non-certified plans accepted by all local building departments
  • Drawn using GIS technology, satellite imagery, and real zoning data
  • Plans delivered via email — easy to review, organized, and ready to submit
  • 15+ years turning complex code requirements into clean, approvable drawings
Get a Free Quote
Expertise, Authority & Trust

Why Thousands of Clients Trust Us

Our qualifications, process, and track record speak for themselves. You always know exactly who you are working with.

15+ Years of Experience

Over a decade and a half producing permit-ready drawings for projects across dozens of states. We know what reviewers look for.

Permit-Ready Drawings

Every plan is drawn to your jurisdiction's specifications so there are no back-and-forth revision cycles holding up your permit.

32,530+ Satisfied Clients

From homeowners adding a fence to developers splitting land — our reputation is built on consistent, proven results nationwide.

Full Money-Back Guarantee

If your site plan is rejected after following our recommendations, you can request unlimited free revisions or a full refund.

Our Services

Permit-Ready Plans, Delivered Anywhere in the USA

Getting a permit shouldn't feel like a second job. We've spent 15+ years turning complicated code requirements into clean, approvable drawings — for homeowners, contractors, and developers from coast to coast.

Foundation

Site Plan

Your project starts here. A site plan shows your structure's footprint, setbacks, easements, and relationship to property lines — exactly what your local building department needs to see. Drawn to your jurisdiction's spec, no revision cycles.

Get a Quote
Layout

Floor Plans

Room dimensions, door and window placement, wall locations, and square footage — all drawn to scale and ready for review. Whether you're adding a room, converting a garage, or building from scratch.

Get a Quote
Visualization

3D Rendering & Design

Before a single nail goes in, see exactly what your project looks like. Our 3D renderings help you catch design decisions early, communicate your vision clearly, and present confidently to HOA boards or planning committees.

Get a Quote
Technical

Drafting

Got a sketch on a napkin or an idea in your head? Our drafting service translates your concept into precise, code-compliant technical drawings. We've done this across dozens of states — we know what reviewers look for.

Get a Quote
Exterior Permits

Elevation Plan

Elevation drawings show the exterior faces of your structure — front, rear, and sides — with finished heights, window placements, rooflines, and exterior materials. A non-negotiable part of most residential permit packages.

Get a Quote
Land Development

Subdivision Design Plans

Splitting land is a legal process, and the drawings have to hold up through every layer of municipal review. We produce lot splits, preliminary and final plats, and full multi-lot developments to your county's exact specifications.

Get a Quote
Transparent Pricing

Choose the Plan That Fits Your Project

Every plan is built using satellite data and real zoning insights — permit-ready across all 50 states. No hidden fees, no surprises.

Basic site plan example drawing

Basic Site Plan

$99

$79

per plan

  • Property Lines
  • Primary Structure
  • Lot Dimensions
  • North Arrow & Scale
  • Roofline & Parcel ID
  • Owner Information
  • Legal Description

Fast, straightforward, and built to get your permit approved without the wait.

Get This Plan
Advanced site plan example drawing

Advanced Site Plan

$139

$99

per plan

  • Includes Basic, plus:
  • Driveway & Fence
  • Sidewalks & Trees
  • Swimming Pool
  • Well & Septic System
  • Patio, Porch, Shed
  • ADU, Carport, Pergola

Perfect for homeowners and contractors who need more than just the basics.

Get This Plan
Elite site plan example drawing

Elite Site Plan — Best Value

$249

$199

per plan

  • Includes Professional, plus:
  • Additional New Structures
  • Legal Setbacks & Topography
  • Custom Size
  • Vicinity Map & Graphic Scale
  • DWG & JPG File Included
  • Rush Order — Under 12 Hours

When accuracy and turnaround time both matter, this is the plan most clients reach for — detailed, permit-ready, and built to move fast.

Get This Plan
Why Choose Us

Thousands of Customers Trust Us for Quick, Reliable Remote Site Plans

We are the largest and most trusted provider in the industry — making us the go-to choice for permit-ready drawings across all 50 states.

Unlimited Free Revisions

We offer unlimited revisions at no charge until you are completely satisfied and your site plan meets all local requirements.

Experienced Team

Our team of designers, engineers, surveyors, and permit experts understand the industry inside out and prepare permit-ready drawings every time.

Technical Support

Have a question or need to update your plan? Our team is always available. Stay in touch with us at any stage of the process.

On-Time Delivery

Whether it's a small floor plan or a detailed subdivision design, your project will be completed and emailed to you within 24 hours.

100% Money-Back Guarantee

You are not at risk with us. If your site plan is rejected after following our guidance, get unlimited free revisions or a full refund.

Budget Friendly

We offer flexible plans — Basic, Professional, and Elite — so you always get the right level of detail at a price that fits your budget.

Fast Approvals

We collect verified site data, understand local zoning rules, and draft accurate plans designed specifically for swift approval the first time.

Customized Plans

We never use a one-size-fits-all template. Every plan is tailored to your specific building layout, position, structure, and local zoning laws.

Advanced Satellite & GIS Technology

We use satellite imagery and GIS technology to capture real-time data on elevation, boundaries, roads, and surroundings — not just manual measurements.

How It Works

Get Your Site Plan Ready Within 24 Hours

A simple, transparent four-step process — from order to approved drawings.

1

Choose a Suitable Package

Select between our Basic, Advanced, Professional, or Elite plans — designed for residential and commercial properties of all types.

2

Provide Property Details

Share your property information including address, size, survey report, sketches, construction type, and any additional measurements.

3

Receive Your Site Plan

After verifying your property details, our team emails you a custom, permit-ready site plan within 24 hours.

4

Review and Refine

Check the plan thoroughly and contact us if you want any changes. Unlimited revisions are included — we respond quickly.

Site plan drawing showing property boundaries, structure, and permit-ready layout
Understanding Our Service

Understanding Our Site Plan Services

When you do not need your project stamped by a surveyor, engineer, or architect, our site plans are an affordable and trusted choice. Our plans are professionally prepared, non-certified drawings that fit most residential and basic permit requirements.

Our plans are drawn to scale and correct — they are not intended to replace official legal surveys, but they are accepted for permit applications by building departments across all 50 states.

To keep the process simple and cost-effective, we do not make on-site visits. We combine high-quality GIS data, satellite imagery, and any drawings, surveys, or measurements you share with publicly available records to develop accurate, well-formatted site plans for your property.

Order Your Site Plan Today
Client Reviews

What Our Clients Say

★★★★★ 4.9-star average — 240 verified reviews
★★★★★
"Got my subdivision approved on the first submission. That alone saved weeks of back-and-forth with the city. Highly professional team."
MR

Mark R., Texas

Property Developer

★★★★★
"They fixed a site plan that another company completely messed up. The difference in quality was night and day. Will use them for every future project."
LT

Lisa T., California

Licensed Contractor

★★★★★
"Fast, clear, and they actually understood the city requirements for my area. Plan was ready in under 18 hours and approved without any revisions."
DK

David K., Florida

Homeowner

Frequently Asked Questions

Your Questions, Answered

Where do you gather property data from?
We use digital mapping tools, GIS technology, and satellite imagery to note building footprints, property boundaries, roads, lot dimensions, zoning details, and more. We also incorporate any surveys, sketches, or measurements you provide for maximum accuracy.
Where can these site plans be used?
You can use our site plans to apply for a building permit, plan construction projects, and perform other construction tasks. They are commonly used to obtain permits for installing sheds, fences, removing trees, retaining walls, additions, and more across all 50 states.
How quickly can I receive my site plan?
Standard delivery is within 24 hours after you provide your property details. The Elite plan includes a rush order option with delivery in under 12 hours for time-sensitive projects.
Can I request revisions or changes?
Yes. All plans include free revisions. If something is missing or needs adjusting based on your original request — dimensions, features, labels — just let us know and we will update the plan promptly.
Which file formats will I receive?
All clients receive their site plans in high-quality PDF format, which is optimal for printing and submission. The Elite plan also includes DWG (AutoCAD) and JPG file formats for maximum flexibility.
What is your refund policy?
If your site plan is rejected after following our instructions and you are not satisfied even after revisions, we offer a full refund. Our money-back guarantee is active for 24 hours after delivery. We stand behind the quality of every plan we produce.
Which payment methods do you accept?
We accept PayPal, Debit and Credit Cards, Digital Wallets, and other modern payment options. All transactions are secure and encrypted.

Still Have Questions?

Our permit experts are ready to answer any question about site plan requirements, local regulations, or your specific project. Reach out directly.

(805) 416-0026
info@duragroep.nl
Get a Free Quote
Order Your Plan

Order a Professional Site Plan for Your Permit

Your permit application is only as strong as the drawings behind it. A missing dimension, a setback that doesn't match local code, a title block formatted the wrong way — any one of those can stall your project for weeks. That's not a risk worth taking.

(805) 416-0026 / (325) 238-9044Monitored 24/7
info@duragroep.nlResponse within a few hours
142 Tannehill Dr, Abilene, TX 79602Serving all 50 states

Our Guarantees

  • Permit-ready drawings accepted by all local authorities
  • Delivery within 24 hours, guaranteed
  • Unlimited free revisions included
  • 100% money-back guarantee

Send a Message to Get a Custom Offer

Tell us about your project and we will let you know exactly what you need and how fast we can turn it around.

Free & no obligation  ·  Secure  ·  No spam

Site Plan Service

Site Plan for Permit: How to Get a Permit-Ready Site Plan

Surprise — you need a site plan. If you've never heard that term before, you're in good company. Most homeowners only find out about this requirement mid-way through filling out a building permit application, which is genuinely not the ideal time to learn.

So what is it, exactly? Basically, it's a scaled drawing of your property — showing where your structures sit, where your boundaries are, and how far everything sits from the lot lines. Nothing too mysterious. Local planning departments use it to make sure your project doesn't violate zoning rules or setback requirements before they sign off.

The good news: once you know what you're dealing with, the process is pretty manageable. This guide walks you through what site plans actually require, how long permits typically take, what you'll spend, and the fastest way to get a drawing in hand — so your project doesn't stall waiting on paperwork.

Get Permit-Ready Plan

How to Order a Site Plan Online

Ordering a site plan online usually requires submitting your property address and project details. A drafting professional then creates a scaled drawing using parcel data, satellite imagery, and GIS mapping before delivering the final site plan.

Typical Ordering Process

  1. Submit property address
  2. Describe the project
  3. The drafting team prepares the site plan
  4. Review and request revisions if needed
  5. Receive permit-ready PDF drawing

Many online services provide 24-hour turnaround for residential site plans.

Get Site Plan
Site plan service workflow from order to delivery diagram

What Is a Site Plan for a Permit?

It is a scaled drawing that shows property boundaries, structures, setbacks, driveways, and other features of a property. Local planning departments require this document to confirm zoning compliance before approving construction permits.

A site plan for a building permit provides city planners with a visual representation of how structures are positioned on a property.

The drawing typically includes:

  • Property boundaries
  • Lot dimensions
  • Existing buildings
  • Proposed structures
  • Driveways and access points
  • Setback distances
  • Easements and utilities
  • North arrow and drawing scale

Planning departments rely on this information to verify that a project follows municipal zoning ordinances and building regulations. Without a site plan, most permit applications cannot be reviewed or approved.

Get Site Plan Now
Site plan for permit drawing example showing property boundaries and structures

Why Do Cities Require a Site Plan for Building Permits?

Cities require a site plan because planning departments must confirm that construction follows zoning regulations such as setbacks, lot coverage limits, and property boundaries. The drawing allows building officials to evaluate project placement before issuing building permits.

Planning staff review site plans to verify:

  • Setback requirements
  • Property boundary distances
  • Lot coverage limits
  • Driveway access
  • Utility easements

These checks ensure that new construction does not violate municipal zoning codes or interfere with neighboring properties.

Planning Review Item Purpose
Setback distance Ensures structures are not too close to property lines
Lot coverage Prevents excessive development on the lot
Driveway access Confirms safe vehicle entry
Utility easements Protects underground infrastructure
Structure placement Verifies zoning compliance

Why Choose Our Site Plan Services?

You come in with a rough idea. You leave with a clean, scaled plan. We've worked with homeowners across cities, counties, and HOAs all over the USA — and the one thing that keeps projects moving is a plan reviewers can actually read without squinting or guessing.

Accepted across cities, counties, and HOAs

Layouts drawn to scale, no clutter

Turnaround often under 24 hours

Unlimited revisions if anything needs tweaking

Details formatted for real permit requirements

No fluff, no back-and-forth confusion. Just plans that get the job done.

Pricing Packages

Pick the Package That Fits Your Project

Do you require a permit-ready site plan quickly? All packages are delivered within 24 hours — simply select the level of detail that best suits your project's needs.

Basic Site Plan

$99
$79

per plan

For homeowners who just need to get the permit done — no complications, no waiting around. This covers everything a reviewer needs to see: your property lines, structure placement, lot dimensions, roofline, legal description, and all the standard details that make approvals happen without back-and-forth. Clean, accurate, and ready to submit.

Best for: Simple residential permits where speed matters most.

Get This Plan
Most Popular

Advanced Site Plan

$139
$99

per plan

This is the one most people actually need. Beyond the basics, it captures the full picture of your property — driveways, fences, pools, septic systems, and every accessory structure from your deck to your ADU. Reviewers get the complete story upfront, which means fewer revision requests and fewer delays.

Best for: Homeowners and contractors who want to avoid surprises mid-review.

Get This Plan

Professional Site Plan

$159
$119

per plan

When your project has moving parts — parking, access points, easements, setbacks — reviewers need more than just the basics. This plan documents everything in detail, reducing the chance of a rejection and showing officials you've thought through the full scope.

Best for: Commercial projects and complex residential builds that need to hold up to scrutiny.

Get This Plan

Elite Site Plan — Best Value

$249
$199

per plan

For projects where getting it wrong isn't an option. You get everything in the Professional plan plus topography, new structure layouts, a vicinity map, legal setbacks, custom sizing, and files in both DWG and JPG. Need it faster? Rush delivery gets it to you in under 12 hours.

Best for: High-stakes or time-sensitive projects where precision and speed both have to be right.

Get This Plan

Do All Building Permits Require a Site Plan?

Not every permit requires a site plan, but most projects that change property layout or add structures must include one. Building departments commonly request site plans for pools, decks, sheds, additions, garages, and new construction projects.

Permits that usually require a site plan include:

  • New home construction
  • Garage construction
  • Home additions
  • Decks and patios
  • Swimming pools
  • Accessory dwelling units (ADUs)
  • Sheds or detached structures

Minor repairs such as roof replacement, interior remodeling, or appliance upgrades typically do not require a site plan.

What Must Be Included on a Site Plan for Permit Approval?

A permit-ready site plan must show property boundaries, lot dimensions, existing structures, proposed construction, setback distances, driveways, utilities, and measurement scale. These elements allow planning departments to verify zoning compliance before approving permits.

Site Plan Checklist

Most municipalities expect the following information:

Property Information

  • Property boundaries
  • Parcel identification number
  • Lot dimensions
  • Address and parcel data

Structures

  • Existing buildings
  • Proposed structures
  • Decks, pools, sheds, or additions

Zoning Elements

  • Setback distances
  • Lot coverage calculations
  • Easements or right-of-way areas

Technical Requirements

  • Drawing scale
  • North arrow
  • Measurement labels

How the Site Plan Review Process Works

After a site plan is submitted with a permit application, planning staff review the drawing to confirm zoning compliance, setbacks, and property boundaries. If the plan meets municipal requirements, the building department can approve the permit.

Typical Permit Review Process

Most municipalities follow a similar process:

  1. Permit application submitted
  2. Site plan reviewed by planning department
  3. Zoning compliance verified
  4. Corrections requested if necessary
  5. Permit approved and issued

For simple residential projects, review may take a few days to two weeks depending on the city.

Why Site Plans Get Rejected by Permit Offices

Permit offices reject site plans when drawings are missing key elements such as property boundaries, setback measurements, structure locations, or scale indicators. Incomplete drawings prevent planning departments from verifying zoning compliance.

Missing property boundaries

Without clear boundary lines, planning staff cannot determine if setback rules are met.

No setback measurements

Setback distances must be explicitly labeled to confirm zoning compliance.

Missing structure locations

All existing and proposed structures must be shown with accurate placement.

No scale indicator

Drawings must include a scale bar and north arrow to be considered permit-ready.

Incorrect formatting

A title block formatted the wrong way can stall your project for weeks.

Frequently Asked Questions

Site Plan Questions, Answered

How Much Does a Site Plan for Permit Cost?
A site plan for permit approval usually costs between $79 and $199 depending on the property size, drawing complexity, and turnaround time. Residential site plans are typically less expensive than commercial development drawings. Our Basic plan starts at $79 and our Elite plan — which includes rush delivery under 12 hours — is $199.
How Long Does It Take to Get a Site Plan?
Most online site plan services deliver residential permit drawings within 6 to 24 hours. More complex properties or commercial site plans may take several days depending on the required level of detail. Our Elite plan includes a rush order option with delivery in under 12 hours.
What Data Is Used to Create a Site Plan?
Professional site plans are created using parcel data, GIS mapping systems, satellite imagery, and property records. These sources allow drafting professionals to accurately show property boundaries, structures, and measurements required by municipal planning departments.
What Types of Projects Require a Site Plan?
Many residential and commercial projects require a site plan before permit approval. Common examples include pool installations, deck construction, fences, sheds, garages, additions, and accessory dwelling units (ADUs) where zoning rules regulate structure placement.
Can You Draw Your Own Site Plan?
Some municipalities allow property owners to draw their own site plan for simple permits. However, many building departments require scaled drawings with accurate measurements, which is why homeowners often use professional site plan drawing services to avoid rejection and delays.

Order Your Site Plan Today

Getting started takes five minutes. Tell us about your project and receive your permit-ready drawings within 24 hours.