📞 Call Now Get a Free Quote →
Start Your Site PlanNo account or payment required
Permit For SitePlan

Loading

Subdivision & Lot Split 📍 Sacramento, CA 👤 Homeowner / SB 9 Applicant

Lot Split Exhibit Turns One Parcel Into Two Buildable Lots — Sacramento, CA

An SB 9 lot split exhibit with the compliance math printed on the sheet — deemed complete where other applicants kept bouncing at intake.

✓ APPLICATION DEEMED COMPLETE ON SECOND CHECK
30 hours Turnaround
$119 Investment
1 Revisions Needed
Professional Site Plan Package Used
01

The Challenge

A Sacramento homeowner pursuing an SB 9 urban lot split needed an exhibit proving both resulting lots met the 40% minimum split ratio, 1,200 SF minimum size, and street access — details the city's intake desk had bounced twice from other applicants that month.

02

Our Solution

We drew the proposed split line creating a 55/45 split, tabulated both lot areas and dimensions against SB 9 thresholds, showed the existing home entirely on Parcel A with conforming setbacks to the new line, and labeled the access easement giving Parcel B its street connection.

03

The Result

The application was deemed complete, and the owner listed the newly created rear parcel with a builder within the month.

The intake checklist table on the drawing itself is what did it — the planner checked boxes straight off my exhibit.

★★★★★ Vince A., Homeowner — Sacramento, CA

Your project could be the next success story.

Send us your property address — we handle the research, drafting, and formatting for your exact jurisdiction.

Start My Site Plan →
💬 Get a Site Plan

👋 Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us