📞 Call Now Get a Free Quote →
Start Your Site PlanNo account or payment required
Permit For SitePlan

Loading

ADU 📍 Los Angeles, CA 👤 Homeowner / Investor

ADU Site Plan Navigates Tight 4,800 SF Lot — Los Angeles, CA

A detached 750 SF ADU squeezed onto a narrow Highland Park lot with exact 4-ft setbacks — approved by LADBS with a single label revision.

✓ APPROVED AFTER ONE MINOR REVISION
22 hours Turnaround
$119 Investment
1 Revisions Needed
Professional Site Plan Package Used
01

The Challenge

An LA investor wanted a detached 750 SF ADU on a narrow 4,800 SF R1 lot in Highland Park. LADBS required proof of 4-ft side and rear setbacks, a dedicated access path from the street, and separation from the primary dwelling — with almost no room to spare.

02

Our Solution

We modeled the lot from the county assessor parcel map and positioned the ADU footprint to hold exactly 4'-0" clearances on both required sides, documented the 36-inch access path, and labeled the 6-ft separation from the main house. Every dimension was called out so the reviewer never had to scale anything.

03

The Result

LADBS asked for one label change on the electrical panel location; we turned it around the same afternoon and the plan was approved.

On a lot this tight, inches mattered. They placed the unit so precisely the city only asked to move one label. That is the whole review — one label.

★★★★★ Priya S., Property Investor — Los Angeles, CA

Your project could be the next success story.

Send us your property address — we handle the research, drafting, and formatting for your exact jurisdiction.

Start My Site Plan →
💬 Get a Site Plan

👋 Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us