Home Addition 📍 Denver, CO 👤 Homeowner

Emergency Re-Permit After a Contractor Abandoned the Job — Denver, CO

A stop-work order, missing drawings, and a half-built addition — reconstructed into an as-built site plan and re-permitted in 9 hours.

✓ APPROVED ON FIRST SUBMISSION
9 hours (rush) Turnaround
$199 Investment
0 Revisions Needed
Elite Site Plan Package Used
01

The Challenge

A contractor walked off a half-built 300 SF addition and took the drawings with him. Denver issued a stop-work order, and the homeowner needed a new site plan reflecting as-built conditions within days to reinstate the permit.

02

Our Solution

On the rush track we rebuilt the site plan from the county parcel data, the original permit record, and the homeowner's photos and measurements — showing the addition as constructed, verifying it still met the 5-ft side setback, and flagging the one dimension that had drifted 4 inches (still compliant).

03

The Result

The reinstated permit was approved in 9 hours flat and a new contractor was on site the following Monday.

Stop-work order Friday, new plan Saturday morning, back to building Monday. I did not think that was physically possible.

★★★★★ Laura M., Homeowner — Denver, CO

Your project could be the next success story.

Send us your property address — we handle the research, drafting, and formatting for your exact jurisdiction.

Start My Site Plan →